Product Facts

Product Name
Selleys No More Cracks Small Cracks & Dents - Ready to Use Wall Filler
Availability
In Stock
Condition
New
Category
Home & Garden > Paint Preparation & Wall Fillers
Seller
Selleys

Selleys No More Cracks Small Cracks & Dents - Ready to Use Wall Filler

Selleys No More Cracks Small Cracks & Dents - Ready to Use Wall Filler. PHYSICAL - Appearance: Cream coloured paste LIMITATIONS / NOT SUITABLE FOR Do not use below 5°C Where movement occurs use Selleys No More Gaps DIRECTIONS FOR USE 1. Ensure surface is clean and dry with no loose or powder material. 2. Spread a thin layer using a filling blade and scrape off excess. 3. Allow 2–3 hours to dry. 4. Sand back with fine sandpaper. 5. Allow longer drying in humid or cold conditions. 6. Apply undercoat before topcoat for best results. 7. Clean up with water before filler dries. 8. Store tightly closed in a cool, dry place. STORAGE Store tightly closed in a cool, dry place. ADDITIONAL SPECIFICATIONS - Drying Time at 25°C: 1mm: 1–2 hours 2mm: 2–3 hours

Selleys No More Cracks Small Cracks & Dents - Ready to Use Wall Filler

Selleys No More Cracks Small Cracks & Dents - Ready to Use Wall Filler.

PHYSICAL

LIMITATIONS / NOT SUITABLE FOR Do not use below 5°C Where movement occurs use Selleys No More Gaps

DIRECTIONS FOR USE

  1. Ensure surface is clean and dry with no loose or powder material. 2. Spread a thin layer using a filling blade and scrape off excess. 3. Allow 2–3 hours to dry. 4. Sand back with fine sandpaper. 5. Allow longer drying in humid or cold conditions. 6. Apply undercoat before topcoat for best results. 7. Clean up with water before filler dries. 8. Store tightly closed in a cool, dry place.

STORAGE Store tightly closed in a cool, dry place.

ADDITIONAL SPECIFICATIONS

Price: Available

Brand: Selleys

View Product

Product Data (OpenAI Spec)

View Full JSON Spec ↗

Specifications

Storage Store tightly closed in a cool, dry place.
Appearance Cream coloured paste
Limitations Do not use below 5°C Where movement occurs use Selleys No More Gaps
Directions for Use 1. Ensure surface is clean and dry with no loose or powder material. 2. Spread a thin layer using a filling blade and scrape off excess. 3. Allow 2–3 hours to dry. 4. Sand back with fine sandpaper. 5. Allow longer drying in humid or cold conditions. 6. Apply undercoat before topcoat for best results. 7. Clean up with water before filler dries. 8. Store tightly closed in a cool, dry place.
Drying Time at 25°C 1mm: 1–2 hours 2mm: 2–3 hours
↑ Back to top